Just in from Peter, the Meister and the Sherriff:
[ Linked Image ]
[ Linked Image ]
Best,
Howy
Howard Waddell wrote: |
Just in from Peter, the Meister and the Sherriff: |
Yippey, yippey, yippey!!! Need I say more?
When I reserved mine, Mike had told me to expect the Sherriff in late February. Is that still the time-frame you are looking at?
-Grey
Greyson Brown wrote: | ||
Yippey, yippey, yippey!!! Need I say more? When I reserved mine, Mike had told me to expect the Sherriff in late February. Is that still the time-frame you are looking at? -Grey |
We still have a couple of steps -- molding, making the first run of production waxes, casting and then assembling the first prototype. A lot depends on the foundry -- sometimes they can turn castings around in 2 weeks, sometimes they can't.
In general, though, we have had pretty good luck with about a 6-8 week turnaround from receiving waxes to finished sword (s). So it will be soon.
Best,
Howy
Could you tell me what the castingwax is named that u use?
Page 1 of 1
You cannot post new topics in this forumYou cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum
All contents © Copyright 2003-2006 myArmoury.com All rights reserved
Discussion forums powered by phpBB © The phpBB Group
Switch to the Full-featured Version of the forum
Discussion forums powered by phpBB © The phpBB Group
Switch to the Full-featured Version of the forum